NEW
Generac's 3.25MW generator is a 2026 CSE Product of the Year Gold Winner.
Energy Systems - Authorized Industrial Distributor of Generac Industrial Energy

Wiring for Transfer Switch & Generator Installations

One of the most frequent technical inquiries from electrical contractors involves determining the correct wiring requirements between the generator and the transfer switch. Establishing these specifications early in the planning phase is essential to avoid project delays, unnecessary coordination, and costly callbacks.

Hero Banner Image

Transfer Switch to Generator: Control Wiring

For the majority of automatic transfer switch (ATS) installations, a standard configuration of 7 control wires is required between the ATS and the generator. These serve the following functions:

  • (2) Start Wires: These wires signal the generator to initiate a start sequence upon the loss of utility power.
  • (3) Position Feedback Wires: These provide status feedback, indicating whether the ATS is in utility, off, or generator mode.
  • (2) DC Power Wires: These supply necessary control power to and from the ATS.

Pro-Tip: Always verify exact voltage specifications and terminal assignments by referencing the specific wiring diagram provided with your Generac model.

Specialized Wiring Requirements

Application

Recommended Cabling

Technical Consideration

Remote Annunciator

(2) #14 AWG & (1) 18/2 shielded stranded cable

Shielded cable (e.g., Belden 3105A) is critical to prevent signal interference on long runs or near power circuits.

E-Stop (<100kW)

(6) #12 AWG stranded wires

E-Stops must be tested during commissioning to ensure safety across all locations.

E-Stop (>100kW)

(4) #12 AWG stranded wires

E-Stops must be tested during commissioning to ensure safety across all locations.

Planning and Code Compliance

While these standards reflect common industry practices, they do not supersede local regulations. Always adhere to the following steps for every installation:

  1. Consult Manuals: Always reference the specific installation manuals for your generator and ATS.
  2. Verify with the AHJ: Confirm all requirements with your local Authority Having Jurisdiction (AHJ).
  3. Site-Specific Analysis: Account for variables such as total wire distance, conduit fill, and grounding requirements.

Partnering with Energy Systems

At Energy Systems, we assist electrical contractors by providing model-specific wiring guidance and component selection support to ensure your projects remain efficient and code-compliant. We support facilities across an extensive service area that spans multiple regions of the United States. To see if your project falls within our service footprint, please refer to our coverage map.

For expert technical support, or to request our wiring guide flyer, contact the Energy Systems Power Systems Team at 1-800-845-8519.

Frequently Asked Questions (FAQ)

Does Energy Systems provide wiring guidance for my specific model?

Yes. We specialize in providing model-specific technical guidance and component support for Generac systems to help contractors streamline installations and ensure code compliance.

Why is shielded cable required for remote annunciator panels?

Shielded cable, such as Belden 3105A, is necessary to mitigate signal interference, which is especially critical when wiring is routed near power conductors or across long distances.

Who can I call for help with my generator installation wiring?

For professional assistance with wiring specifications and site-specific scenarios, contact the Energy Systems Power Systems Team at 1-800-845-8519.